Order receipts in 2012 amounted to €116m (2011: €77m) some 50% more than in 2011. The order book at the end of 2012 totalled €50m (same period 2011: €36m).

In 2012 two significant projects were launched. A plywood mill that was destroyed in a fire in Chile is to be reconstructed and a new LVL mill, which will use beech as its raw material, will be constructed in Germany.